挖机
Ask for a price Online store
Service Hotline 400-8878-318
挖机
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

【Excellent Service Case】High-quality service, warm winter

  • 2022.03.25

On the eve of the Spring Festival, although the cold wind is biting, the construction site is in an orderly manner. The customers are busy settling the project payment, and the operators are also working overtime to meet the construction deadline with quality and quantity.

One afternoon, the equipment operator of Shandong Zhonglian Hengxin Company sent a message: the company's SR280 equipment was faulty, and it was suspected that the mast cylinder was broken, resulting in the overall tilt of the mast. The on-site management also called, making it clear that this is the last pile of the year, and the last 3 meters are still left to be completed. After the completion and acceptance, Party A will pay the project payment. If the equipment fails to be completed within the time specified by Party A, it may affect the settlement of the project payment for the whole year. The company's leaders attach great importance to it and instruct that the equipment must be repaired as soon as possible under the premise of ensuring safety. The situation is very urgent, there is no delay, Shandong service engineer Sun Guohua received the order information and understood the situation, quickly brought all the maintenance tools to the construction site.



After Sun Guohua arrived at the construction site, he immediately inspected the faulty equipment and found that the piston rod pin of the right mast cylinder was broken, causing the entire mast to tilt, and the angle of inclination was still increasing. Next to the construction site is the city road, the pre-holiday traffic flow is large, once there is a rollover, the consequences will be unimaginable. After considering the situation on site, he immediately negotiated with the customer and gave a solution: immediately coordinate a large crane to lift the equipment mast to prevent overturning. It was close to 7 p.m. when the crane arrived at the scene, when the temperature plummeted. In such a cold working environment, Sun Guohua hung the crane coupler after repeated debugging, stabilized the car body, and relieved major safety hazards. Subsequently, immediately communicate and negotiate with the parts department to ensure that the new cylinder arrives in the shortest possible time.

After two days of communication and follow-up, the cylinder was successfully replaced, and the equipment resumed normal construction. It ensures that the customer completes the construction within the time agreed in the contract and settles the project payment with Party A. Customers have highly praised and recognized Sany's response speed and service quality.

Exceed industry standards and exceed customer expectations. Sany uses the best quality service to dispel the cold winter and warm every customer.


undefinedundefined