Sany Renewable Energy Sany Renewable Energy (SH:688349)

The first SPCS project in Jiangxi Province landed: the construction project of Pingxiang Ehu School successfully completed the installation of the first section of SPCS cavity column!

  • 2023.02.23

  • Trinity Construction

On February 23, 2023, the construction project of Ehu School in Pingxiang, Jiangxi Province successfully completed the installation of the first section of the SPCS cavity columnTrinity ConstructionThe successful launch of the first application project of SPCS technology system in Jiangxi Province has taken a crucial step to promote the high-quality development of prefabricated buildings in Pingxiang City, and accelerated the transformation and upgrading of the local traditional construction industry.


The construction project of Goose Lake School is developed by the Education and Sports Bureau of Pingxiang Economic Development Zone, undertaken by Zhongding International Engineering Co., Ltd., designed by Pingxiang Architectural Design Institute, and provided by Sany Construction Technology Co., Ltd.

The total construction area of the project is 41,913.14 square meters, the building covers an area of 11,173.43 square meters, and the seismic fortification intensity is 6 degrees, including primary and secondary school teaching buildings, canteens, office buildings and other supporting facilities. Among them, the middle school teaching building has a total of 5 floors, with a construction area of 16,850.25 square meters, a reinforced concrete frame structure, a building structure safety level of two, and SPCS cavity columns are used on the 2-5 floors to meet the requirements of 30% assembly rate.


In this project, the SPCS cavity column connection nodes are as follows:


The construction process of SPCS cavity column is as follows:


Sany Construction Engineering Central China Technology Center provides customers with professional prefabricated solutions and full technical empowerment.

Through all-round and meticulous guidance such as reserved pre-embedding and position correction of steel bars, production of hoisting tooling and auxiliary tools, use of steel bar connection and extrusion machinery, and solutions to common problems, the hoisting workers of the general contractor unit quickly mastered the installation skills and greatly improved the construction efficiency. The prefabricated monolithic concrete structure form of post-pouring and superposition also makes the overall safety of the structure higher, and dispels the owner's doubts about the safety of the prefabricated building structure of the school.


Originally, the project will be officially put into use in September this year, in the case of tight time and heavy tasks, the multiple advantages of Sany Construction SPCS structural system provide a strong guarantee for the project to achieve the construction period goal.

The implementation of the construction project of Pingxiang Ehu School has opened up the market in Jiangxi region, and also shows that the SPCS structure system is being widely recognized by local society and industry experts. In the future, we hope to continue to build a new ecology of intelligent construction with industry partners, promote the high-quality innovation and development of the construction industry, contribute to the industrialization and intelligent upgrading of China's traditional construction industry, and contribute to the transformation of green, low-carbon and environmental protection, and contribute to the high-quality development of the industry and the national economy.