挖机
Ask for a price Online store
Service Hotline 400-8878-318
挖机
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

Climb with load! Let's see how good the STB300T5-8 is

  • 2023.03.07

  • Sany crane

Recently, the Guangming Ecological Energy Ecological Park project in Guangming District, Shenzhen, Guangdong Province has started in full swing and is currently in the foundation construction stage. After the completion of the project, it will be used for waste-to-energy incineration, so the site was selected in a mountainous area away from the densely populated area. The undulating terrain with steep slopes makes the difficulty of construction skyrocket.



At the scene, there are 5 SanyTelescopic crawler craneThe operation is being carried out in conjunction with the rotary drilling drill. Among them, 3 sets of STB300T5-6 are on the flat ground, and the reinforcement cage is lifted by the telescopic crawler crane after the processing is completed at the construction site, and then the cage is lowered after walking to the designated position. On average, one telescopic boom is matched with 2-3 rotary drilling rigs.


The other two STB300T5-8, after hoisting the steel cage at the foot of the mountain, pass through the slope of about 30 ° with the load, and walk 150-200 meters to reach the designated position and get out of the cage.





Jing Wenjun, the operator of STB300T5-8, said: "The construction of the rotary drilling drill needs to cooperate with the water flow to clean the equipment and solidify the cave wall, and the site is generally muddy. If you use a traditional truck crane, in addition to building roads and paving steel plate sleepers, you also need to move and beat legs one after another. ”


With the same crawler as the high-torque walking reducer and the excavator, Sany's telescopic crawler crane shows its skills in mountain construction. The muddy road surface is also not afraid, and the tilt of 4° can still be lifted, and there is no need to smooth the road surface.




The STB300T5-8 has been upgraded, it operates more smoothly, has three slewing modes, and is in position with precision and no slippage. The transition is faster, the crawler telescopic only takes 5 minutes, and the mobile phone APP can remotely control the climbing, which can reduce one commander and increase the efficiency by 40%. In addition to supporting the foundation construction, it can also cover 60% (<55m) of the tower construction.


Jing Wenjun, the operator of the STB300T5-8, said: "Originally, I was a little worried before entering the field. But after actual use, I found that the power output of this model is more stable, it upgrades the Weichai 154kw China IV engine, the use experience is better, and the construction efficiency does not decrease but rises. ”



Shen Wenchao, chairman of Shenzhen Mingchao Construction Co., Ltd., said: "In fact, when I saw that there was forest land at the job site, I was not worried at all, after all, the strength of Sany telescopic crawler crane was there. There are even a few drivers who took the initiative to invite Yingxiang to participate in this project, they are all masters who drive Sany telescopic crawler cranes, and they know the equipment very well, and some of them directly assured me that this work is not only capable, but also can be completed in advance within the construction period. ”



It is understood that after the completion of the Guangming Energy Ecological Park, it will become the sixth energy ecological park project in Shenzhen, which will play a positive role in promoting the development of the regional green ecological and environmental protection industry.

Recommended products

craneConstruction case