Trinity piling
What?
And low headroom!
It's going to be a quick transition again!
And a big pile path!
Don't worry
Sany SR175-S can do it all
Construction Overview
Project Name: A power transmission and transformation project in Yichang City
Drilling information: pile diameter 2.4m, pile length 10m
Stratigraphic characteristics: clay
Construction method: 2.4m sand bucketconstruction
projectEnvironment: Mountainous area, construction location with high-voltage lines

Project Background
The SR175-S is small and extraordinary
The customer proposed that the equipment should not only be able to do power projects, but also be able to complete the construction of support piles and plant piles, so the drilling depth of the equipment was also required. After understanding the customer's needs in all aspects, the R&D personnel immediately carried out the scheme design, and the commercial department simultaneously confirmed the procurement cycle, and communicated the feasibility of the scheme with the customer in a timely manner, and finally finalized the new Sany China IV SR175-S model, and formulated a low headroom scheme according to the special needs of the customer.
The construction height of this equipment is 12.9 meters, the transportation length is only 11.05 meters, the transportation height of the whole machine with a rod is 3.57 meters, and only 9 meters of board trucks are needed in the city to realize the transfer transportation and easy disassembly, which effectively solves the problem of frequent transfer of customers' mountain roads and power piles, and saves transportation costs; SR175-S is equipped with φ377-4*8.4 machine lock rod, which can achieve a maximum drilling depth of 30 meters. Effectively meet the customer's follow-up support pile, plant pile and other construction requirements. The customer highly recognized the SR175-S low headroom customized solution.

Ultra-fast delivery and soaring performance
At present, the equipment has successfully completed the construction of a bid section, and other power company customers visited the construction of the equipment on the spot, and spoke highly of this equipment, and immediately ordered a device with the same configuration3Monthly delivery.
Through the joint efforts of all departments of the company, it is only used35It will complete the process from scheme design, long-cycle parts procurement to the main machine off the assembly line in a few days, so as to win valuable time for customers. Before the equipment is delivered, the customer receives a notice from the project department3root2.4mThe large pile is in urgent need of construction,SR175-SThe maximum drilling diameter of the equipment is:1.5m。 In order to meet the customer's large pile diameter construction needs, our company recommends customized drilling tools for customers in combination with construction methods, and the service engineer provides fixed-point service on site, and the equipment is successfully completed2.4mLarge pile construction.
In response to the needs of different customers for low headroom,SR175-SLow headroom rigs can also be customized in height from6meters to13The special drilling rig of about meters is used to meet the special needs of customers to the greatest extent. This low headroom drill rig design expands for the customerRotary drilling rigsThe construction field also brings new profit growth points for rotary digging customers.
Only what you can't think of
There's nothing we can't do
Trinity piling
Practical actions are being taken
Mechanized construction for transmission lines
Make your contribution