挖机
Ask for a price Online store
Service Hotline 400-8878-318
挖机
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

Sany tower crane domineering help, Jixin high-speed construction project "full firepower"

  • 2023.03.15

  • Sany crane

Since the beginning of this year, the Jixin high-speed construction project has been "full fire" and has been steadily advancing. The builders anchored the construction goal, reversed the construction period, seized the "golden period" of project construction with full enthusiasm, and pressed the "acceleration button" of project construction.



At the foot of Luoyang Qingyao Mountain, on the bank of the Yishui River, more than a dozen bridge piers are rising from the ground, and the Jixin Expressway Yihe Bridge is gradually taking shape. A brand new shiny SFT125 (T6016-8C5) Sany tower crane stands here, bringing a touch of warm and bright color to the cold riverside. On the other side of the construction site, several extended trucks loaded with standard sections have entered the site and are waiting to be unloaded, and the second SFT125 (T6016-8C5) is about to be erected.



Mu Jianchao, bridge construction manager of Henan Jiubijiu Machinery Equipment Co., Ltd., said: "Jixin Expressway Yihe Bridge is located in the second division of Jixin Expressway, the number of piers of this bridge is large, most of them are 50 to 70 meters high, and the highest pier is as high as 78 meters, close to the height of 30 floors, generalTruck cranesDue to the limitation of the site, it is far from being able to complete the loading task, so we dispatched the tower crane for this construction. ”



The construction of bridges is difficult and costly, and there are strict technical requirements for the quality, stability, reliability, and environmental adaptability of tower crane products.


Mu Jianchao said: "We have carefully considered the selection of equipment, and the raw material of this SFT125 (T6016-8C5) on the board is made of Baowu steel, which has a greater bearing capacity and guaranteed quality. The main structure has four hanging towers, and the disassembly and assembly efficiency is very high. In addition, there are intelligent functions such as automatic networking and intelligent control, which are safe and secure. ”




The Jiyuan-Xin'an Expressway construction project has a total length of 48.5 kilometers, with a total of 18 bridges, 3 tunnels, 3 interchanges and 1 service area, and is expected to be completed in June 2025. Mu Jianchao said: "Now the first batch of 2 towers, and we are expected to enter 30 Sany tower cranes in other engineering sections of Jixin Expressway in the future." ”


After the completion of the project, it will play a major role in driving the development of tourism resources along the route, improving people's livelihood, coordinating urban and rural and regional construction, boosting rural revitalization, and improving the living standards of the people along the highway.

Recommended products

craneConstruction case