The hoisting boss, who mainly focuses on large tonnage, often has a more unique vision when choosing equipment: not only strong performance, but also high efficiency, low failure, and good operation. According to Brother Chong's observation, these requirements of "both want and want" are probably only met by a "versatile warrior" like SAC8000C7-8. This model has the best performance in its class, and it can easily fill up all aspects of ability in a straight line.
combat power is off the charts,Easily cover a wide range of working conditions
The SAC8000C7-8 full-reach main boom is 91m, the jib is 48/66m, the wind power jib is 10-58m, and the counterweight is 183t.
Main boom working condition: 28.4m main boom, 10m amplitude, 197.9t lifting, 50m main boom, 20m amplitude, 105t, 91m full outrigger, 20m amplitude, 45.3t. Fully cover the over-lifting conditions of the main boom of 500-600 ton products to meet the needs of bridge and shield hoisting;The main boom over-lifting condition: 39.5m arm length, 10m amplitude, 203.2t lifting, 50.6m main boom, 20m amplitude, 108.2t, 91m full extension arm, 14m amplitude, 92t;Boom working condition: 144.1m arm length, 30m amplitude, 23.3t lifting, longest boom length 150m, 30m amplitude, 21t lifting, tower boom working condition longest arm over 160m, to meet the needs of aerial work;Wind power working conditions: 3.0MW wind power maintenance and 130m mixed tower tower hoisting, 91m long main boom + short wind boom (10-16m), fast and efficient maintenance of 1.5-2.0MW wind turbine.
Solid chassis,Move flexibly and control the whole game
The 2,400-ton heavy-duty axle of the same class, coupled with 505 large tires and 7-axle chassis, increases the carrying capacity by 50%, and the heavy-duty transition is effortless.
With armband leg transfer, the speed is 50km/h, which can save 3 hours per 100km; With arm strap leg strap over-starting transition, the speed of 20km/h, can save 7.5 hours per 100km.
The SAC8000C7-8 body is short, the length of the vehicle with arms is only 21m, and there is no pressure on the culvert with more than 4.5m. Don't hurt the car, don't take a detour, and be one step faster than others, that's the advantage.
Worry-free operation,It's not just money that is saved
SAC8000C7-8 has three span combinations (50%/75%/100%) and three swing radii (9.2m/8.1m/7.1m), and the site is extremely adaptable. The counterweight displacement can be up to 2m, and the counterweight can be reduced by 30t under the same working conditions, reducing the transportation of a flatbed truck. The purchase and operation costs of flatbed trucks alone can save millions in 10 years.
In addition, the jib, tower arm, counterweight and other equipment can be used with some old models, and this wave of operation saves not only money, but also less worry, less coordination and less trouble.
With strong combat power, fast operation, and easy operation, the SAC8000C7-8 demonstrates the high level that an "all-round warrior" should have. If you also want to win a place in high-level hoisting, you might as well let it bless you and directly have the strength of crushing.
0 comments