The reels are busy! This 240-ton machine works fast, earns more, and is more competitive for big work

  • 2023.11.02

  • Sany crane

Not long ago, Li Junping, the owner of Dongguan Juntong Machinery Leasing Co., Ltd., received a task: it was necessary to complete the welded steel frame and double girder bridge type in the fieldcraneHoisting in place. Once the hoisting equipment enters the site, a lot of work on the site will be forced to stop, so the operation efficiency is the most important thing for Party A.


Originally, it was planned to arrange a 300-ton crane to enter the site with overtake, but the site was limited and the time was urgent, and Party A was hesitant to choose the hoisting equipment.




After Li Junping understood the situation, he thought that the STC2400C8-8 in his hand could be tried.


He said: "First, this is the industry's first 240-ton truck crane, with an 8-section main boom full extension of 90m and a maximum boom length of 120.5m, and the lifting performance is not inferior to a 300-ton crane. Second, the car is more agile and takes up less space on the field. Third, the tonnage is smaller, and the shift fee will be lower, which can reduce the cost of Party A to a certain extent. ”After careful deliberation by both sides, STC2400C8-8 entered the field.



On the morning of the first day, the equipment began to be assembled, and the welded steel frame was officially hoisted in the afternoon, with a STC2400C8-8 full reach arm of 80 meters, and the lifting weight reached 15 tons. After the hoisting is completed, the STC2400C8-8 will start the transition immediately after unloading part of the counterweight.


Li Junping introduced: "If it was originally planned to use 300 tons of belt to enter the site, the transfer assembly time may take half a day more. ”




The next morning, the STC2400C8-8 began to assemble and reload and carry out outrigger debugging. At 11 o'clock on the same day, the double girder overhead crane was hoisted, with a full boom of 75 meters and a lifting capacity of 20 tons, and the lifting task was successfully completed.


Li Junping said: "The STC2400C8-8 operation is efficient, and the lifting time is greatly reduced compared with the original plan, and Party A is very satisfied with this. In addition, from the point of view of operating costs, this 240 tons also gave me some surprises. ”




"This truck has a strong lifting capacity, many working conditions do not need to be overlifted, plus the short-distance heavy-load transfer ability is good, I can save the cost of two large trailers."


"The crane is from Dongguan to Huizhou, the whole journey is nearly 100 kilometers, the cost of two trailers is nearly 3,000 yuan, so I have not lost a little bit of money, and Party A is a win-win situation, which makes me more competitive in the future."




craneConstruction caseApplication scenarios