挖机
Ask for a price Online store
Service Hotline 400-8878-318
挖机
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

Changsha has added two more cross-river passages, and green construction shows new ideas for urban construction

  • 2024.07.04

Recently, for the people of Changsha, who live in the "happiest", the happiness index has soared again, the Xiangluzhou Bridge and the Xiangya Road River Crossing Tunnel are about to be opened to traffic, and the number of Changsha Xiangjiang River crossings has increased to 14. Through the Xiangluzhou Bridge, Wangcheng District's journey across the east and west banks of the Xiangjiang River was shortened to 5 to 10 minutes.


The Xianglu Chau Bridge in the light test
Image from: Changsha release

The Xiangya Road cross-river tunnel prepared for opening to traffic was opened to traffic
Picture from: Hunan Daily Gu Pengbo

The cross-river bridge, cross-river tunnel and cross-river subway have accelerated the blood flow in Changsha, coordinated the development of both sides of the Xiangjiang River, continuously improved the vitality of the city, and emerged as a star in the central city.

Xiangjiang Fisherman's Wharf

Picture from: Changsha Yuelu District People's Government Network


It is said that Hunan people "dare to be the first", and in the construction process of these two cross-river tunnels, it also reflects the "bold taste" of Hunan people.The construction parties of both projects tacitly chose electriccraneParticipate in the construction, actively respond to the national green environmental protection carbon reduction requirements, and reflect the humanistic care for the surrounding residents


In particular, the Xiangya Road cross-river tunnel, the construction site is close to the school and residential areas, and the construction noise control is very strict, so the construction party adopts itSTC1300C8PHEVIts low noise characteristics have won wide acclaim from the surrounding residents. The equipment is almost at full capacity during the construction process, working an average of more than 16 hours a day, which provides a strong guarantee for the rapid advancement of the project and civilized construction.


Electric cranesThe application in the Xiangjiang River crossing channel project has been fully demonstratedNew energy equipment is efficient, low noise and low emissionIt provides new ideas and directions for future urban construction.


STC500E5BEV-8 construction at the Xiangluzhou Bridge

Photo: Sima Xiongfeng





STC1300C8PHEV construction of the river crossing channel on Xiangya Road

Photo: Li Xianglei






Recommended products

craneConstruction case