挖机
Consult prices Online store
Service Hotline 400-8878-318
挖机
Consult prices Online store
Service Hotline 400-8878-318
Sany Heavy Industries Sany Heavy Industry (SH:600031)
Trinity International Sany International (HK:00631)
Trinity Renewable Trinity Renewable Energy (SH:688349)

The six-dimensional advantages of Sany Construction Industrialization's "structural safety, excellent cost, green wisdom, fast and provincial" are highly adapted to the requirements of the national "6633 Good House"

  • 2025.10.24

  • Trinity Builders

At the press conference of the State Council Information Office on October 11, 2025, Ni Hong, Minister of Housing and Urban-Rural Development, systematically expounded the "6633" standard that a "good house" should have, namely "six noes" (no mold, no blockage, no leakage, no noise, no cracking, and no smell), "six preventions" (electricity prevention, fire prevention, disaster prevention, theft prevention, collision prevention, and fall prevention), "three provinces" (worry-free, land-saving, and money-saving) and "three essentials" (healthy, practical, and caring). This standard profoundly responds to the people's core concerns about a high-quality living environment, and also points out the direction for the transformation and upgrading of the construction industry.Trinity BuildersAs a firm promoter of building industrialization, its self-developed SPCS (cavity wall column, equivalent heterogeneous, corner backpouring, in-plane operation + industrialized electromechanical and prefabricated decoration) and "technology, equipment, cloud platform" overall solution are highly in line with the national new building industrialization policy, and fully respond to the "6633" requirements put forward by Minister Ni Hong with the advantages of the six dimensions of "structural safety, excellent cost, green wisdom, and fast saving".


1. The six dimensions of SPCS correspond to the depth of "6633"

1. Structural safety → Achieve "six preventions" and "no cracking"

SPCS adopts the technology of "cavity wall column and equivalent isomerism", and the seismic performance of the structure is better than that of cast-in-place through the strong constraints of grid steel bars (the density is 2.25 times that of traditional cast-in-place) and the overall connection of corners and back-casting, which fundamentally eliminates the risk of structural cracking. Combined with industrial electromechanical and prefabricated decoration, pipeline separation and dry construction, it effectively prevents leakage and air leakage, and improves fire prevention and disaster prevention capabilities. The tooling fixture is coordinated with the cloud platform to realize the controllability of the whole process of the construction process, and the anti-collision and anti-theft are also guaranteed.


2. Cost optimization → implementation of the "three provinces"

The pure structure cost of SPCS is lower than that of traditional prefabricated processes such as grouting sleeves and double leather walls, combined with industrial electromechanical and prefabricated decoration, to achieve "structure as building", eliminate the plastering process, and save decoration costs. Through the resource integration and intelligent scheduling of the Zhuxiang Cloud platform, the waste of man, machine and materials is reduced, the efficiency of capital use is improved, and it truly achieves "worry-free, land-saving and money-saving".


3. Green wisdom → support "health" and "anti-mold and anti-odor"

SPCS components are produced in the factory and assembled on-site, which greatly reduces dust, noise and construction waste, and is in line with the concept of green construction. Cavity wall columns are combined with industrial mechanical and electrical to improve indoor air quality and eliminate mildew and odor. The cloud platform realizes intelligent operation and maintenance of equipment through BIM+IoT, early warning of faults, and ensuring residential health.


4. Good quality → ensure "no blockage, no leakage, no noise" and "practicality"

SPCS components are produced by high-precision molds, with a flat surface and no plastering, and the cavity design is convenient for pipeline layout to avoid clogging hazards. The joints of the components are treated with strict treatment and have excellent waterproof performance. Industrial interior partition walls and prefabricated decoration improve sound insulation and create a quiet living environment. Structure is architecture, with high space utilization and strong practicability.



5. Build fast → to help "save time and worry"

The SPCS system supports "parallel engineering and cross operation", and the construction speed of the standard layer can reach 4~5 days/floor, and the outer frame is eliminated for in-plane operation, improving construction safety and efficiency. Winter construction is not affected, the construction period is highly controllable, the project is delivered faster, and the people move in earlier.


6. Save trouble and worry → Reflect "care" and "worry"

From design to operation and maintenance, SPCS relies on the "Zhuxiang Cloud Platform" to achieve digital management of the whole process and reduce human error and rework. The quality of components can be traced, the construction process can be verified, the settlement is transparent, and disputes are reduced. Owners, construction parties, and government parties can all feel the care experience of "building with peace of mind and living with peace of mind".

2. SPCS Overall Solution: Build a "6633 Good House" with Industrial Thinking

With the mission of "industrializing construction", Sany Construction has built a technical system with SPCS as the core, covering the technical route of "cavity wall columns, equivalent heterogeneity, corner backpouring, in-plane operation + industrialized electromechanical, prefabricated decoration", intelligent PC/AAC/steel bar/crushing and other equipment, and the construction of the cloud platform. The system has been widely used in lighthouse construction sites across the country, such as Tianjin National Synthetic Biology Center, Beijing Changping Resettlement Housing, Shanghai Fengxian New Town, Shenzhen Qianhai Talent Housing and other projects, all of which have achieved the comprehensive benefits of "structural safety and cost, green wisdom and fast province".


At the policy level, SPCS is fully in line with the country's orientation of vigorously developing prefabricated buildings and promoting the coordinated development of intelligent construction and building industrialization. The "6633" proposed by Minister Ni Hong is not only a definition of "good house", but also a specific guide for the high-quality development of the construction industry. Through SPCS technology, Sany Construction has transformed "6633" from a concept into a practical technical path and product standard, contributing the "Sany Plan" to Chinese-style modern architecture.


Construction industrialization is the only way to a "good house". In the dual context of the "double carbon" goal and the construction of digital China, Sany Construction uses SPCS technology as the engine to promote the construction industry from "extensive and scattered" to "lean and intelligent manufacturing", from "construction site" to "factory", and from "construction" to "product". We firmly believe that only by industrializing construction can we truly realize the "6633 good house" advocated by Minister Ni Hong, so that every family can live with peace of mind, comfort and peace of mind. "Let there be no difficult buildings in the world" is not only the vision of Sany Construction, but also our solemn commitment to this era and hundreds of millions of people.

——Sany Builders, build the home of the future with you.

Recommended products

Trinity BuildersCorporate honors