2025.10.31
March 2025
Nanjing, Jiangsu
House construction
Pile Mechanics
Geological conditions:silt, clay, red sandstone, pile diameterΦ0.7m, pile depth 34m, body open bucket, sand bucket
Ability comparison:measured torque, lifting speed, terminal power,noise and other more than 10 performance indicators are dominant
Energy efficiency comparison: Mains electricity and hybrid each account for half, and energy consumption costs64% lower, overall efficiency ↑ 23%
Operator evaluation:The whole machine has fast response and smooth operation, and the control is comfortable.Safety, humanized design




