2025.12.31
November 2025
Nangang District, Taipei City
House construction
Pile Mechanics
Equipment model:The SDC120 has currently worked for 1317.9 hours
Slot width:1.0m、1.2m、1.5m、1.8m
Groove Depth:56~57m
Construction process:The upper soft soil layer adopts the grab modified by the massakou to grab, and then to a certain depth after the grab can not be grabbed, and then the double wheel milling into the rock, no rotary excavation pilot hole, the single wall adopts the "three grasps into grooves" construction method, the length is 6m, and the individual groove sections will also adopt the "five grasps into grooves" method due to conditions restrictions, with a length of 9m.