2016.07.15
2007-07
Zhengzhou, Henan
Railway/tunnel construction
Concrete machinery
The construction of Zhengxi Railway Passenger Line officially started in July 2007. This passenger dedicated line from Zhengzhou in the east, to Xi'an in the west, basically parallel to the Longhai Railway, with a total length of 484.5 kilometers, the construction period of 4 years, after the completion of the train can reach more than 200 kilometers per hour, a thousand miles away only takes three hours to arrive. Sany Equipment has 8 pump trucks, 20 trailer pumps, 6 road rollers, cranes, rotary drilling rigs, etc., in the Henan section of Zhengxi Railway, which mainly undertakes the piers, girder pouring and tunnel construction of the road section. Sany's high-quality service and excellent product performance have won the trust of customers. The construction party said that with Sany equipment, it was full of confidence in the construction.