2016.07.15
2007-05
Leibo County, Sichuan Province and Yongshan County, Yunnan Province
Water conservancy and hydropower
Concrete machinery
In May 2007, in the world's third largest hydropower station, Xiluodu Hydropower Station Gezhou Dam Construction Bureau in the pouring of tail bridge girder concrete, because the construction requirements of pouring concrete ratio can not meet the pumping requirements, and the construction scope is large, the elevation angle is high, so the domestic * 8983 tire belt machine produced by our company is used for construction. In the construction, the amount of cement poured by the tire belt machine is less, which can effectively reduce the internal temperature rise of concrete, and the quality control of concrete is more powerful; In addition, the mobility is good, the concrete conveyed is not limited by the ratio, and the conveying speed is fast, the boom telescopic rotation is flexible, the working range is large, and the great economic benefits have been produced, and the construction unit has been well received.