2016.07.15
2005-01
Shanghai
Housing construction
Concrete machinery
On January 28, 2005, the floor of the Shanghai World Financial Center Building was continuously poured with a concrete volume of 28,000 cubic meters, which was required to be pumped within 40 hours, and was constructed by Shanghai Construction Engineering Group. Concrete can not be interrupted in the pumping process, the quality requirements are high, pumping is difficult, Shanghai Construction Engineering Group selected 4 sets of Sany HBT80C-2118D pumps, 2 sets of HBT60C-1816DIII. pumps for concrete construction. In the pumping process, Sany pump has high configuration, high pressure, large displacement and high reliability, and the user is very satisfied.