2016.07.15
2001-07
Shanghai
Railway/tunnel construction
Concrete machinery
With a total length of 32 kilometers and a total investment of 12 billion yuan, the Shanghai Maglev Rail Transit Project is Asia's *8981 long maglev train track. China Railway 16th Bureau undertook the construction of 10.2 kilometers of 420 bridge piles, and the concrete construction was carried out by Sany's SY5290THB-37 pump truck. The construction site has extremely high requirements for the stability of the concrete pump's performance, especially when pouring the underwater pile at a horizontal level of -70 meters, the failure rate of the concrete pump is required to be zero. Sany pump truck began pumping on July 20, 2001, there was no failure, glasses plate, cutting ring, concrete piston used normally, the construction unit is very satisfied.