Excavators
Ask for a price Online store
Service Hotline 400-8878-318
Excavators
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

Sany Trailer Pump conquers the world's largest large-span tubular concrete medium-bearing arch bridge - Wushan Yangtze River Bridge Project

  • 2016.07.15

Construction time

2003

Construction site

Chongqing

The type of project

bridge

Device type

Concrete machinery

Wushan Yangtze River Bridge, located at the entrance of Wuxia in the Three Gorges section of the Yangtze River, is a steel pipe arch bridge with a total investment of 196 million yuan. The bridge deck has a net width of 19 meters, 4 lanes in both directions, and a main span of 492 meters. The total length of the approach road of the bridge is 7.4 kilometers, and the roadbed is 8~12 meters wide. It is known as "Yudong Gateway Bridge" and "Yudong *8982 Bridge". Its span diameter is up to 460m (net); The amount of concrete used is 38,669 m³; The amount of steel used is 9022t.

Trinity