2016.07.15
2008-08
Beijing
Housing construction
Concrete machinery
Beijing Yintai Center - Beijing Yintai Center, located in the core area of the CBD in the background, is a high-rise building in Beijing*8982. With a total area of 350,000 square meters, it is designed and constructed according to the standard of a five-star hotel. The total cost is more than 1.5 billion yuan, and the main building has a total of 63 floors and a total height of 249.9 meters. The building is poured with C35 ceramsite concrete for 1-5 floors, C40 ordinary concrete for 6-40 floors, and C35 ceramsite concrete for more than 40 floors, with a total pumping volume of 40,000 cubic meters. Due to the use of ceramsite concrete, it was required to be completed within 18 months. Therefore, it is difficult to pump and the construction task is tight.
In order to ensure the smooth construction, the contractor Beijing Urban Construction Yatai Construction Co., Ltd. chose Sany Trailer Pump to undertake the concrete conveying task of this project, including 2 HBT80C-1818D trailer pumps and 1 HBT60C-1816D trailer pump, the pumping characters were successfully completed, and the customer was very satisfied.

Next article: Dalian Changxing Island to Mashandian Expressway