Excavators
Ask for a price Online store
Service Hotline 400-8878-318
Excavators
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

Sany Trailer Pump participated in the construction of Jinghong Power Station

  • 2016.08.16

Construction time

2006

Construction site

Jinghong City, Xishuangbanna Prefecture, Yunnan Province

The type of project

Water conservancy and hydropower

Device type

Concrete machinery

The construction of Jinghong Power Plant has created a record of 8981 fastest construction speed of hydropower stations of the same scale in the world, with a total construction period of only 78 months, setting a new record for the construction speed of million-kilowatt hydropower stations at home and abroad. It will use the world's *8983 water-driven vertical ship lift to realize the navigation of the Lancang-Mekong River with a high dam, and is designed according to the standard of five-class waterway and 300-ton ship.

Huaneng Jinghong Power Plant is located in Jinghong City, Xishuangbanna Prefecture, Yunnan Province, known as the vanguard of the construction of "Yunnan Electric Power Pillar Industry" in the industry, and is the sixth level in the "Two Reservoirs and Eight Levels" plan in the middle and lower reaches of the Lancang River Mainstream Hydropower Base, the upstream is connected with Nuozhadu Hydropower Station, and the downstream is the Olive Dam Hydropower Station, *8981 Dam is 108 meters high, and 5 turbines with a rated capacity of 350,000 kilowatts and a rated head of 60 meters are installed, with a total installed capacity of 1.75 million kilowatts and a designed annual power generation capacity of 7.8 billion kilowatt hours.
2-1.JPG
 
2-3.JPG
 
2-3.JPG
 
2-4.JPG