2016.12.28
2015-5-1
Wuxin Expressway Jining Section 2 Standard 40KM
highway
Road machinery
DURING THE THREE-MONTH ASPHALT PAVEMENT CONSTRUCTION PERIOD, THE EQUIPMENT WAS STABLE, AND THE PROGRESS OF THE PROJECT WAS NOT AFFECTED BY THE EQUIPMENT, AND THE CONSTRUCTION EFFECT WAS VERY GOOD, AND THE FLATNESS OF THE SURFACE LAYER REACHED 1.6MM. It has been unanimously recognized and praised by the owner and supervisor. A neat and uniform full set of Sany equipment shuttles across the Inner Mongolia prairie, leaving a broad avenue with the footsteps of Sany.
A full set of Sany equipment: two sets of SAP120F, six sets of YZC13C, two sets of YL26C, one set of STR30C, one set of LB4000