2018.04.19
December 2016
Changsha
Railway/tunnel construction
Earth-moving machinery
Changsha Metro6The line is on 2016 year12month28The construction starts on a daily basis, the project period is tight, and the construction requirements are very high.SY35UThe fuselage is small, and the total width of the chassis is only1720mmIt can work in a variety of narrow working conditions. And the equipment adopts a unique tailless design, and the tail swing radius is only860mmNo matter how you work, the tail will not exceed the track, which is very suitable for narrow conditions such as subway construction.