2020.10.12
2004-09
Beijing
highway
Road machinery
The Sixth Ring Road of Beijing is one of the key projects of the Olympic project, which is designed according to the standard of two-way four-vehicle expressway. Among them, the construction section of the South Sixth Ring Road of the Sixth Ring Road of Beijing, with a total length of 23 kilometers, is undertaken by Beijing Route Group. According to the plan of the Beijing Municipal Government, the Sixth Ring Expressway will be built into a high-grade highway that is second to none in China*8983, and its high technical indicators and construction difficulty have set a record in the history of China's highways. This time bySany Heavy IndustryThe black pavement complete set of equipment to undertake the middle surface asphalt paving of this section of the project, the equipment used includes: 1 LHZ25A asphalt transfer truck, LTU90SPaversOne each and three YZC12sroad roller, one YL25ATyre rollers。
The construction time of Sany Heavy Industry's black pavement equipment was from September 5, 2004 to October 6, 2004. During the construction process, the performance of the equipment is stable, the work is easy, the connection and cooperation of each link are scientific and rigorous, and the paved road surface is smooth and uniform. It ensured that the project progressed on schedule and won the praise of users. Sany Heavy IndustryRoad construction machineryAs a benchmark product in the industry, it has fully entered the Beijing Olympic construction project represented by the Sixth Ring Road.

Next article: Shanxi Jincheng Danhe Express Line Project