Longtan Yangtze River Bridge in Jiangsu Province
earthwork
Concrete machinery
Recently, the transportation hub project of Jiangsu Province participated in the construction of Sany pumping equipment - Longtan Yangtze River Bridge,After 52 hours, the caisson steel shell was poured 6,500 square meters of concrete at one time。 Long-term, uninterrupted construction, which is a big test for concrete equipment, Sany pumping equipment through the reliable quality and service personnel escort, excellent completion of the task.
Sany complete sets of concrete equipment,
Assist the transportation hub project in Jiangsu Province
The Longtan Yangtze River Bridge is 4963 meters long,The main bridge adopts a steel box girder suspension bridge with a main span of 1560 meters, and one span crosses the river.The main span is among the best in the world。 Among them is the South Anchor IngotA total of 216,000 m³ of concrete was builtis an out-and-out "concrete monster",The concrete used in the project will be conveyed by Sany Concrete machinery.

Longtan Yangtze River Bridge connects Yangzhou Yizheng in the north, Nanjing City and Zhenjiang Jurong in the south. The line passes through Longtan Seaport Hub, Lukou International Airport, isJiangsu ProvinceAn important project to build an integrated transportation system。After completion, it will be important to accelerate the process of urbanization of Ningzhenyang,facilitateDevelopment of the Yangtze River Economic BeltIt has an important role.
Eight lightweight concrete mixer trucks, two 52-meter pump trucks, one 49-meter pump truck and one 47-meter pump truck were invested in the pouring of the caisson steel shell, and the new concrete commercial mixing station was put into operation for the first time.6500 square meters of concrete requires continuous and uninterrupted construction of equipment, which has high requirements for the quality stability of the equipment. According to the construction party,"Sany Heavy Industry's concrete equipment has a good reputation and reliable quality, which is our first choice."

Trinity red forest,Caisson steel shell one-time pouring concrete site
Gold service, pouring completed 3 hours in advance
After receiving the notice from CCCC No. 2 Public Bureau, Sany service personnel went to the site one day in advance to conduct site survey, design the support position of the pump truck, the route of the vehicle road conditions and the distribution of the pumping and pouring parts, and conduct a comprehensive inspection of the concrete machinery and equipment, so as to be foolproof.

Sany pumping equipment construction site
According to the construction plan of China Railway Bridge supervision, the mixing time of each plate of the mixing plant is required to be 90 seconds, and after the service personnel reasonably adjust the batching and unloading time sequence, the production line of the three or two mixing plants produces 170 cubic meters of concrete per hour, far exceeding customer expectations.
After days and nights of fierce battles,Sany concrete machinery completed pouring in 52 hours, 3 hours earlier than the estimated time, saving project time。 He Xiaogang, general manager of Hubei Wanpeng Machinery Leasing Co., Ltd., said, "Our mixing plants, transport tankers, and car pumps are all selected Sany brand, because we trust Sany!We are loyal fans of Sany, and Sany's equipment is very good!”

He Xiaogang, general manager of Hubei Wanpeng Machinery Leasing Co., Ltd
At present, 80% of the high-rise buildings above 300 meters in China are completed by Sany pumping equipment, and all high-rise buildings above 500 meters are pumped by Sany equipment. Gold and silver cups are not as good as the customer's reputation. In the future, Sany will continue to break through the limits of product research and development, create higher quality products, and bring customers a "life-free experience" with "unparalleled" services.