First, the best choice for large-scale wind power Comprehensive coverage8. X and below wind turbine installation, meet the safety requirements of 80% load factor 110m high and 20m amplitude lifting weight 252t 100m high 18m amplitude lifting weight 270t 120m high 21m amplitude lifting weight 235t 140m high, 24m amplitude, lifting weight 200t 160m high, 27m amplitude, lifting weight 163t Second, the golden power is more able to run 8-axle drive, all-wheel steering, multiple transition modes; Kessler heavy-duty axle + Bridgestone 505 tires; The speed ≤ 70km/h, the climbing degree ≤45%; The load-bearing performance is increased by 30%. Third, the speed of operation is more efficient Working efficiency: 8XMW wind turbine nacelle (230t only takes 15 minutes to lift into place; Disassembly and assembly efficiency: 120 minutes for the boom to disassemble and assemble, 70 minutes for the turntable to disassemble and assemble, and 60 minutes for the over-starting disassembly. Fourth, double winch configuration It can lift 270 loads to an altitude of 100 meters; Wireless adjustment double winch technology, no rope limit for fan maintenance; The wireless level has a heavy-duty hook ± 0.5°, and the lifting is more accurate. Fourth, minus 30 degrees can be started Engine + transfer case with clutch + oil pump (disconnectable) with independent fuel heater on board, minus 30° cold start worry-free.
Due to the continuous update and progress of technology, the differences between technical parameters and configurations and the actual product shall be subject to the actual product; In addition, the machine on the picture may include additional equipment.