Why does he insist on using electricity even after all the troubles?

  • 2023.06.15

  • Sany crane

Recently, Shanxi Hejin Shenggeng Machinery Equipment Co., Ltd. has the electricity consumption data of a STC250E-1 plug-in crane, which surprised Chongge. This equipment was delivered in early May this year, and as of the end of May, the electricity consumption has been close to more than 700 kWh, which can be said to be quite fierce. What's going on? Let's take a look.



It is understood that this STC250E-1 plug-in crane is participating in the construction of Qingxu Sunshine International Business Center project in Qingxu County, Shanxi Province.After entering the construction site, you can see that there are three rotary drilling rigs in the field, and there is one next to each rotary drilling rigTruck cranesIn conjunction with the lowering and installation of reinforcement cages, this STC250E-1 is one of them.



STC250E-1 works almost 24 hours a day, and the hoisted steel cage weighs about 1 ton, and the whole process uses electricity.Chai Guojie, the boss of Shenggeng Machinery Equipment Co., Ltd., introduced: "Sany's plug-in car has been on the market for 2 years, and it is basically used in fixed scenes such as pressure briquettes, steel structures, roads and bridges. ”

In order to allow the STC250E-1 to be plugged in smoothly, Chai Guojie actively negotiated and communicated with the construction site, and installed a power distribution cabinet and more than 20 meters of extension cables by himself to facilitate the movement of the car and reduce the frequency of cable collection and improve the operation efficiency.



Even with all the effort, Chai Guojie still insisted on using electricity, he said: because the operating cost is too low."On the construction site, we are responsible for all the fuel and electricity costs of the equipment. Conservative calculation, if the oil operation, 5 days are expected to consume about 200L, diesel fuel is calculated at 7 yuan/liter, and a day of hoisting operation will need 280 yuan. If you use pure electricity, it will be about 35 degrees per day, and the maximum electricity consumption on the construction site will be 3 yuan/kWh, which will cost 105 yuan per day, and you can save more than 170 yuan a day. This economic account is clear at a glance after a little calculation. ”



"There are still many peers who will wonder, will I agree to do this? In fact, the current construction sites are pursuing 'green', and they are naturally more willing to use electricity to reduce emissions from the source. Of course, the situation is different from place to place, and this golden abacus has to be carefully studied by yourself how to start. ”



In the fiercely competitive market environment, Shenggeng Machinery Equipment Co., Ltd. not only creates a better electricity environment and more opportunities for itself, but also unlocks a new scenario for the application of plug-in cranes in Shanxi. Actively trying, you can always find new opportunities.