2023.07.18
Trinity piling
Yunnan is referred to as "Yun" or "Yunnan", located in the southwest of China, with pleasant climate and gorgeous natural scenery, and is China's radiation center facing Southeast Asia. At present, the infrastructure construction in Yunnan is in full swing, and the Honghe Bridge project, where Sany SR525 equipment is located, is one of these many bright pearls.
The Honghe Bridge is located in the K109+280 of the Eshan-Shiping-Honghe Expressway in Honghe Autonomous Prefecture, Yunnan Province, located in the U-shaped canyon, with low-lying terrain in the middle, designed to cross the Red River, with complex strata, conglomerate, sandstone, dolomite, and a variety of mixtures. The bridge deck width is 28.1 meters, the bridge length is 892.5 meters, and it is the first three-tower short tower cable-stayed bridge in Yunnan Province, which has the characteristics of tight construction period, slightly weathered sandstone interlayer is mostly inclined rock surface, construction verticality is difficult to control, and high pile foundation accuracy requirements. The abutments on both sides of the bridge are gravity abutments, the main pier of the substructure adopts thin-walled hollow piers, and the transition section adopts rectangular piers of equal cross-section, with a maximum pier height of 160 meters and a main tower height of 44 meters. The bridge is one of the control projects of "three bridges and two tunnels" of Eshihong Expressway.

Whether the pile foundation can be completed with high quality is related to the safety of the entire bridge and even the entire highway project. There are a total of 75 piles in the three main piers, with a pile diameter of 2.8 meters and a pile depth of 85~88 meters. Wuhan Jinke Foundation Engineering Co., Ltd., the company's VIP customer, has 7 different models of our companyRotary drilling rigs。 Through the study of geological reports and on-site rock samples, we have communicated many times about equipment selection, construction plan, operator operation, and customized a variety of drilling tools of different specifications, with a single pile hole forming time of 3~4 days, comprehensive fuel consumption of 40~45L/h, and the quality of the pile hole fully meets the design requirements.
Superior product performance and efficient service quality make it the most beautiful in the depths of the mountains. Sany Construction Method adheres to overcoming hardships, dedication, and helping customers succeed, and is committed to contributing to the infrastructure construction of bridges, high-speed railways, and industrial and civil construction in southwest China.

2025.06.26

2025.06.12

2025.05.31
0 comments