挖机
Ask for a price Online store
Service Hotline 400-8878-318
挖机
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

The "first hanging" completed the first hanging, and the SAC40000T high-altitude lion dance amazed the audience

  • 2024.11.26

The day before yesterday, Zhejiang Hopson Hoisting purchased the world's first 9-bridge 4,000 tonsAll-terrain cranesSAC40000T The first crane was successfully completed in the 200,000 kW wind power project in Pingchuan, Baiyin, Gansu Province.



The 6.25MW wind turbine installed in the project has a hub center height of 120m, a cabin weight of 150t, and a total lifting weight of 180t including spreaders. In terms of lifting weight alone, it is a bit overkill to use SAC40000T, and it is the reason for choosing itUnrivalled flexibility of the Nine Bridges

The project is a typical mountain wind power, with many slopes and sharp bends, and the working face site is very limited:The center of the tower is about 40m away from the cliff edge, and the equipment should complete the U-turn and swing horizontal standing position in a very narrow space after entering the field, and the operating radius is about 24m, in the words of the on-site personnel: 1m long is not enough.



Du Weihui, the project leader, said: "Because of site constraints, it is difficult for cars to enter and put in the ten bridges, and only this nine bridges can meet them. ”

In addition to the advantages of size, the assembly and transition efficiency of the SAC40000T also made the construction party full of praise:

  • The assembly speed is fastIt only takes an hour for the left and right overheads to be fully loadedZhang Jie, the person in charge of the equipment, said: "This is our first time to install, and the next time it will be faster, absolutely within an hour." ”
  • Strong weight-bearing transition abilityCombined with different wind farm terrains, a variety of transition modes are provided.The heaviest can be with full arms, full legs, main winch and over-lifting transitions。 In this SAC40000T, he carried the whole leg, the first and second arms and the telescopic cylinder, successfully challenged the continuous S-shaped sharp bend with a maximum slope of 30% and a length of 2.5 kilometers, and successfully arrived at the position, which greatly saved the disassembly and assembly time of the equipment between the transitions.
  • High work efficiency: The hoisting time of the 5th tower is 14 minutes, and the cabin hoisting is completed in 19 minutes.


With the advantage of 9 bridges, SAC40000T successfully passed many S-bend challenges


SAC40000T with outriggers/one and two arms to drive to the stand


65 minutes to complete the full installation of Chaoqi


The day before the hoisting, receive the baptism and blessing of Ruixue

The first hanging performance of the SAC40000T,Sun Lei, general manager of Zhejiang Hopson Hoisting CompanyThe review says: "This 9-axle belt boom is very flexible in the mountainous transition, and this time the seat is so small, it only took 4 hours for the branch to group the car. Its humanized design is really good, reducing a lot of time, especially the over-up assembly, 2 over-up only took an hour. There is also a slotted design of the pull plate, which can be connected by one person, which greatly saves assembly time, and the other is to synchronize these with a super mast and a healthy one, such a large car, so high efficiencyNo.1”。



Recommended products

craneConstruction case