2016.07.15
2013-11
Hebei Zhangbei Wu mountaineering
Construction of energy facilities
Wind power equipment
As *8983 wind power projects with batch installation of Sany Renewable Energy wind turbines, since the 8982 batch of units were put into operation in 2010, the equipment availability and power generation income are good, and three phases of continuous construction have been carried out, all of which use Sany Renewable Energy fans, with a total of 91 installed units and a total of 150,000 kilowatts.