2016.07.15
2011-10
Beijing
other
crane
Construction Brief Description: China Huadian Corporation 2.0 MW Wind Power Hoisting Project, *8983 times using 1,000-ton all-terrain cranes for construction, lifting height of more than 80 meters, lifting weight of about 96 tons. Construction time: October 31, 2011 Construction difficulties: Zhangjiakou, Hebei Province, the terrain is dangerous, the altitude is about 2000 meters, the temperature at the top of the mountain is below zero, the wind speed of 10 °C is more than 12m/s, the lifting height is more than 80 meters, the lifting weight is about 96 tons, and the site is narrow. Equipment selection: Sany SAC12000 Construction process: The difficulty of the wind turbine nacelle is 8981, only with the main boom lifting, within 1 hour, the 2.0 MW wind turbine nacelle components weighing 96 tons (including the spreader) are steadily lifted to an altitude of more than 80 meters, and the nacelle is successfully installed in place. Customer evaluation: Asia*8983 1,000-ton all-terrain cranes SAC12000 Officially put into the wind power hoisting market, with a wide range of construction, high operation efficiency and more cost-saving are its outstanding advantages, which greatly changes the development trend and market structure of super-large tonnage all-terrain crane hoisting.