2016.07.15
2008-12
Inner Mongolia Ordos Jungar Banner
mine
Coal machinery
Equipment Type: EBZ160C Time of use: December 2008 - June 8, 2009 Place of use: Inner Mongolia Erdos Jungger Banner Unit of use: Mengnan Group Diaijiugou Coal Mine roadway and its geological conditions 1, the total length of the roadway is 4000 meters. 2. The hardness of the roadway rock is F6, and the cross-sectional shape is arched. Roadway support section and form Section: 4.2 meters× 3.4 meters Support: anchor net spray joint support footage cumulative footage: 1030 meters; Average footage: 15 m/day; *8981 Advance Footage: 21 m/day. Use Condition Sany EBZ160C roadheader has been used so far, and the total construction footage is 1030 meters due to the constraints of production conditions such as anchoring. Overall, the performance of the equipment is stable and the failure rate is low.