挖机
Ask for a price Online store
Service Hotline 400-8878-318
挖机
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

Sany concrete equipment in the Wuhan-Guangzhou high-speed railway Xiangtan beam yard

  • 2016.08.17

Construction time

2007

Construction site

Hunan

The type of project

bridge

Device type

Concrete machinery

The Wuhan-Guangzhou Passenger Line is the southern section of the Beijing-Guangzhou Passenger Line (Wuhan-Guangzhou section), located in Hubei, Hunan and Guangdong, with a total length of about 1,068.8 kilometers and a total investment of 116.6 billion yuan.

5-1.jpg

On December 9, 2009, the trial operation was successful, and it was officially put into operation on the 26th. *8981 has a high operating speed of 394 miles/hour, and it can be reached in 3 hours from Wuhan to Guangzhou. The travel time between Wuhan and Guangzhou has been shortened from about 11 hours to about 3 hours, and the direct travel time from Changsha to Guangzhou takes only 2 hours. The Wuhan-Guangzhou high-speed railway has become the world's fastest high-speed railway with a speed of 8981 and a density of 8981. And it is also China's * 8982 high-speed trains with a speed of 350 km/h.

5-2.jpg

Wuhan-Guangzhou high-speed railway is known as China's two major high-speed railway trunk lines Beijing-Guangzhou high-speed railway and Beijing-Shanghai high-speed railway, and connected, Wuhan-Hangzhou high-speed railway, Han-10 high-speed railway, Yanjiang high-speed railway, etc., constitute a dense high-speed railway network in the east and west of China.