Excavators
Ask for a price Online store
Service Hotline 400-8878-318
Excavators
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

Sany cloth pole participated in the construction of Oasis Plaza in the United Arab Emirates

  • 2016.09.22

Construction time

Construction site

United Arab Emirates

The type of project

Housing construction

Device type

Concrete machinery

Emirates Oasis Plaza is located on Sheik Zayed Road, a four-storey shopping mall with a total area of 1.44 million square feet, and six Sany HG32C distribution poles are involved in the construction of the project.

Emirates Oasis Plaza .jpg

Unimix Construction, a user, praised the Sany Placement Pole equipment: "The Sany Placement Pole can operate continuously for 8 hours, maintain a stable performance output during the operation, and can maintain a free height of 18 meters, so we do not need to build through the traditional layer-by-layer floor construction method." It is precisely because of such excellent operating equipment as Sany Placing Rod, that our construction workers feel extremely comfortable in their work, which has played a great role in improving operation efficiency.