2020.10.14
In 2020
Inner Mongolia Sugri
Petrochemical
Petroleum equipment

Sany Petroleum 2500 fracturing truck unit did not fail in the low temperature environment and harsh working conditions, and lasted 18 days, completing the operation of large horizontal wells ahead of schedule. Sany Petroleum 2500 fracturing team went to Inner Mongolia Wushenqi Sulige Gas Field to carry out high-pressure large-scale gas well fracturing construction, challenging the most complex large-scale fracturing project of "Wanfang Liquid, Thousand Fangsha" in China's largest integrated gas field. The train group has been operating continuously for more than 16 hours without stopping the machine, pulling out the pump, or changing the pump consumables, and the equipment runs stably and efficiently. During the construction period, the sand output is 400 cubic meters, the liquid volume is 6000 square meters, the displacement is 6 square meters, and the pressure is 25~55Mpa, and the equipment fully meets the technical requirements of on-site construction.