Equipment category: 80 drilling two-story manipulator
Device model: Z80RP280
Device code: 19RP02800093
Customer name: 80106 team of Zhongyuan Drilling Company
Construction time: March 2020 to present
Construction performance description:
In March 2020, a two-story drilling manipulator was installed for the 80106 team of Zhongyuan Drilling Company No. 1 in Wusu City, Tacheng Prefecture, Xinjiang Uygur Autonomous Region. Due to the particularity of the operation, the drilling workers need to continue to work 24 hours a day, and the temperature difference between day and night in the Wusu area is large, and the continuous operation at an altitude of more than 40 meters at night is undoubtedly a huge torment.