Construction of energy facilities
Railway/tunnel construction
Housing construction
Municipal utilities
Other works


Leading performance
Main boom working condition: 29.4m boom crane weight 74t, full outrigger 88m hoisting weight 9t
Boom working condition: 82.2m main boom + 36m jib 32m amplitude lifting weight 2t
Heavy-duty chassis
It can drive at low speed with 22t counterweight + four outrigger cushion boxes
It can take 40km/h to save a trailer
Configuration leading
Non-quadruple double: Weichai + Dongkang, no need to add urea on the car
Weichai WP12 engine + Fast 12-speed automatic box (with liquid slow) + Hande Bridge
Optional overlift: with overlift performance comparable to 300t, ↑40%, and the longest overlift jib is 125m
The jib is common with 130-220 tons, and the hook is common with 100-220 tons
Brand new two-room, vehicle remote control