Construction of energy facilities
Railway/tunnel construction
Municipal utilities
Housing construction
Other works


Powerful performance
Main boom working condition: 29.3m boom crane weight 90t, full outrigger 88m hoisting weight 6.5t
Jib working condition: 82.1m main boom + 34m jib 60m amplitude lifting weight 1.1t
The chassis is strong
The 55-ton dismantling arm does not dismantle the leg, which is more convenient to get on the high speed
It can be driven with 29t counterweight + four outrigger pads
Configuration leading
Non-quadruple double: Weichai WP12 + Dongkang, no need to add urea on the car
Double slewing motor + double volleyball slewing bearing, more stable for heavy load
The jib is common with 130-260 tons, and the hook is common with 100-200 tons
Brand new two-room, vehicle remote control