Municipal utilities
bridge
Petrochemical
Housing construction


Powerful performance
Main boom working condition: 29.3m boom crane weight 91.3t, full outrigger 88m hoisting weight 7t
Jib working condition: 82.1m main boom + 34m jib 60m amplitude lifting weight 1.1t
The chassis is strong
It can be driven with 29t counterweight + four outrigger pads
Configuration leading
Non-quadruple double: Weichai + Dongkang, no need to add urea on the car
Weichai WP12 engine + Fast 12-speed automatic box (with liquid slow) + Hande Bridge
Double slewing motor + double volleyball slewing bearing, more stable for heavy load
The jib is common with 130-260 tons, and the hook is common with 100-200 tons
Brand new two-room, vehicle remote control