2024.12.31
October 2024
Shaoxing, Zhejiang
highway
Piling machinery
Project Overview:The starting point of this project is located at the junction of Danshan Village and Yuecheng, Dongguan Street, Shangyu District, which is connected smoothly104 National Highway Yuecheng section, the route through the water forest on the north side of Danshan Pond, under the Hangzhou-Shaotai intercity railway reserved underpass point, and then in the north of Chenjia Village, Mashan Village between the plain area of the line, to the southeast to Jinggangfeng, set up the Kangjiahu Tunnel, out of the tunnel across the three highways, the end point in the Cao'e River set up Artemisia Dam interchange communication 104 National Highway Artemisia Dam to Shengzhou section and planning 309 provincial highway, the total length of the route is 9.49km. At the same time, 1 connecting line of National Highway 329 and Zhanqian Avenue will be constructed, with a route length of 4.35km. The main line is set up with two interchanges, and the connecting line is set up with one interchange. The main line and connecting line are two-way six-lane first-class highways, with a design speed of 80km/h, a width of 33m for the main line base, and a width of 32m for the connecting line.
Construction Equipment:SR435-S






