2021.04.27
2021.4.21
Dulbert County, Daqing City
Petrochemical
Petroleum equipment


Equipment Condition:1500type multi-functional hydraulic vehicle1platform
Construction time:2021.4.21
Construction area: Dulbert County, Daqing City
Construction conditions: oil well fracturing operations
Average Pressure:44-62Mpa
Average fluid volume:1050square/bike0.6-0.9square
Equipment performance:1500The multi-functional fracturing truck cooperates with the coiled tubing truck, and the performance of the high-pressure and small-displacement construction process is outstanding, and the product performance is highly recognized by customers.
Next article:SAC8000T - Wind power maintenance, one of a kind



