2021.04.16
2021.04
Yulin, Shaanxi
Construction of energy facilities
crane
SAC8000T:
It has two main boom length combinations: 5-section arm (full extension 64.6m) and 8-section arm (full extension 100m), tower jib 90m, and maximum lifting height 154m.
Two wind power jib combinations, 55.5m/17m wind power jib, T5 [120.1m]: 64.6m+55.5m, T8 [117m]: 100m+17m.
It is equipped with a standard 140t counterweight, with a maximum counterweight of 190t, a variable position of 1.7m, and a counterweight of 120t under wind power maintenance conditions.
The 113m height lifts 100t, covering the installation of 2.0MW wind turbines below 90m, and meets the lifting of 2.2-2.5MW mainstream wind turbine impellers.
The maximum lifting height of the tower is 154m, and the 140m hub center height wind turbine gearbox can be overhauled.