2023.04.21
Fengmang Energy
On April 20, the new energy cloud platform released the "Report on Announcing the List of the Second Batch of Renewable Energy Power Generation Subsidy Projects in 2023".
According to the report, a total of 21 projects will be included in the second batch of renewable energy power generation subsidies in 2023, with an approved/filed capacity of 1,284 MW, including: 4 wind power generation projects with an approved/filed capacity of 548 MW; 14 solar power generation projects, with an approved/filed capacity of 632 MW; 3 biomass power generation projects with an approved/filed capacity of 104 MW.A total of 28 projects with an approved/filed capacity of 1,716 MW were changed to the list of renewable energy power generation subsidies, including: 20 wind power generation projects with an approved/filed capacity of 1,521 MW; 6 solar power generation projects with an approved/filed capacity of 147 MW; The number of biomass power generation projects is 2, with an approved/registered capacity of 48 MW.
See below for details:



Next article:National Energy Administration: It is proposed to abolish 11 wind power policy documents

2025.05.19

2025.04.28

2025.03.24
0 comments