Ningxiang Longtian Wind Farm Project Completion Environmental Protection Acceptance Survey Publicity

  • 2021.06.30

1. Project Introduction:

Project Name:Ningxiang Longtian Wind Farm Project

Construction:Ningxiang Gushanfeng New Energy Development Co., Ltd

Construction site:In Longtian Town, Ningxiang City, Hunan Province

Content & Scale:The total installed capacity of the project50.0MW, co-design and installation14The capacity of a single machine is as follows:2.5MWof wind turbines and5The capacity of a single machine is as follows:3.0MWof wind turbines, each generator set configuration35kVof box-type transformers, altogether19seat1seat110kVBooster stations, collector lines and construction and maintenance roads, etc. The area occupied by the booster station5922m2The main buildings are: production building, living building, pump room, fire pool, oil depot, and the total area of the house is1519.09m2, the main setting of the booster station110kVGISequipment110kVMain change1Units, capacity50MVA35kVSwitchgear8(where the collector incoming3back),1coverSVGReactive power compensation device,2set of filteringFCChannel equipment, secondary equipment, communication equipment, etc. The length of the new construction road of the project is about17.4kmThe design of the road in the field considers the combination of eternal and advent, and the road design standard is the width of the road subgrade5.5m, the road surface is wide4.5m。 The total investment of the project4392210,000 yuan Wind farm projects2019year7month3Obtained the "Hunan Provincial Department of Ecology and Environment on the Environmental Impact Report Form of Ningxiang Gushanfeng New Energy Co., Ltd. Ningxiang Longtian Wind Farm" Hunan Environmental Impact Assessment Form[2019]6No. approved, the main project of the project is in2019year7month15The official start of construction began,2020year10Month-on-grid power generation, currently entering the trial operation stage.

 

Second, the completion of environmental protection acceptance of the work procedures:

1In accordance with the "Environmental Protection Law of the People's Republic of China" and the "Interim Measures for the Environmental Protection Acceptance of Construction Projects" and other relevant provisions, determine the type of environmental protection acceptance investigation documents for completion; (2Study national and local laws, regulations, and standard documents related to environmental protection, study technical documents and other documents related to construction projects, and conduct preliminary environmental status investigation and preliminary engineering analysis; (3Investigation of environmental status and engineering analysis of construction projects; (5Investigate the environmental protection measures taken by the project and the effects of their implementation; (7public participation surveys; (8Give the conclusion of the environmental protection acceptance investigation on the completion of the construction project, put forward environmental protection rectification measures and suggestions, and complete the preparation of the environmental protection acceptance investigation report form.

 

3. The environmental protection acceptance work of the project completion includes:

1the overall situation of the project; (2Scope of investigation, etc.; (3Implementing standards; (4Project Overview; (5review of environmental impact assessments; (6implementation of environmental protection measures; (7environmental impact surveys; (8environmental management and monitoring; (9Conclusions of the investigation.


4. The main matters for soliciting public opinions on this project:

1What do you think is the current quality of the environment?

2How well do you know about the project?

3What do you think will be the impact of the project on the local environment?

4What do you think can be done to reduce environmental impact?

5What is your attitude towards the project from an environmental point of view?

People who are concerned about the construction of the project are welcome to put forward relevant opinions and suggestions on the environmental protection of the project. The public comment period is from now on10working days. Members of the public can also provide comments by telephone or email.


5. Construction unit and contact information

Construction unit: Ningxiang Gushanfeng New Energy Development Co., Ltd             

join  system  Person: Manager Deng

electricity        Speech:18373819663


Sixth, the completion of environmental protection acceptance investigation unit and contact information

Investigation unit: 230th Research Institute of Nuclear Industry                       

join  system  Person: Zhou work

electricity        Speech:17096736189

mail        Weave:410007

 

Ningxiang Gushanfeng New Energy Development Co., Ltd

230th Institute of Nuclear Industry

2021year6month18day