2022.01.24
2022.1.24
Huaiji County, Zhaoqing City, Guangdong Province
earthwork
Piling machinery

1. Project Introduction
Project Name: Huaiji Fangkai-Construction case of Tianyue City project
Construction unit: Gaozhou Feixiang Engineering Co., Ltd
Construction time: The construction time of pile foundation is 2021year10month-2022year2Month.
2. Construction preparation:
1.equipmentSR360E;
2. Drilling tools: diameter1meters of barrel drills, and1.2meters of barrel drills, as well800millimetre1m and1.2rice sand bucket;
3.drill pipe:SK508fifth-generation machine lock drill pipe;
4.Auxiliary equipment: excavators, truck cranes.
Third, the construction method requirements:
For different formations, drill buckets, sand buckets, tube drills with drilling, the construction geology is hard soil layer and the construction environment is good, the site is flat, the formation is hard, there is no need to use mud wall protection, and not under the casing, direct drilling can be.