Huaiji Fangkai-Tianyue City project construction case

  • 2022.01.24

Construction time

2022.1.24

Construction site

Huaiji County, Zhaoqing City, Guangdong Province

The type of project

earthwork

Device type

Piling machinery



1. Project Introduction

Project Name: Huaiji Fangkai-Construction case of Tianyue City project

Construction unit: Gaozhou Feixiang Engineering Co., Ltd

Construction time: The construction time of pile foundation is 2021year10month-2022year2Month.

Working condition analysis: The project is located in Huaiji County, Zhaoqing City, Guangdong Province, with geological report analysis and engineering pile diameter800mm,1m1.2m,The hole is deep17meters to25meters, the opening is a hard soil layer,5-12m is a slightly differentiated mudstone,12The meter to the final hole is moderately weathered mudstone.


2. Construction preparation:

1.equipmentSR360E;

2. Drilling tools: diameter1meters of barrel drills, and1.2meters of barrel drills, as well800millimetre1m and1.2rice sand bucket;

3.drill pipe:SK508fifth-generation machine lock drill pipe;

4.Auxiliary equipment: excavators, truck cranes.


Third, the construction method requirements:

For different formations, drill buckets, sand buckets, tube drills with drilling, the construction geology is hard soil layer and the construction environment is good, the site is flat, the formation is hard, there is no need to use mud wall protection, and not under the casing, direct drilling can be.