2022.08.22
August 2022
Xinjiang Altay
earthwork
Piling machinery
SR435PRO strengthens the design for the construction of large pile foundations such as housing construction, bridges, high-speed railways, highways, etc., and is more efficient in the construction of large hole deep piles such as pebble layers and hard rock layers.

【Project Introduction】
As an important part of the northern passage of the Silk Road Economic Belt, the G217 Altay-Burjin Highway occupies an important position in promoting the construction of the economic belt. At the end of the project, it is connected to Jimuno Port through the S319 line, and to the Aheitu Buike Port through the G331 line.
The completion of the project is of great significance, which is conducive to reshaping Xinjiang's status as a commercial and trade center in the "Silk Road Economic Belt".

【Project Scale】
The main line has a total length of 68.885 kilometers and is four-lane in both directions

【Geology and landform】
The landforms of the Altay region are complex and diverse, mainly divided into mountains, hills, plains and deserts. The rock formation is hard, and the components are slightly weathered granite + slightly weathered sandstone, with a hardness of 80~130 megapascals.




