2023.11.24
October 2023
Shenzhen
Municipal utilities
Piling machinery
Project Location:Shenzhen, Guangdong Province
Device Model:SR505
Pile diameter:1500mm、1800mm、2200mm
Pile Depth:40~55m
Geology:0~15m plain fill, silty clay, gravel
15m~35m full, strongly weathered granite
35m~final hole medium and slightly weathered granite, rock depth ≧2D, rock saturation compressive strength 80~100MPa
Construction technology:Mud wall protection, cone coring construction
Construction Method:The upper part adopts a pick sand bucket to drill at one time;
Graded drilling of 1.5m → 2.2m pick barrel drill and pick sand bucket with strong weathered granite;
Medium weathering and slightly weathered granite are graded with 1.5m→ 1.8m→ 2.2m cone drills and pick sand buckets;
The whole hole forming time is 1.5~2 days.