Project Name: Hunan Minfeng-Xiangtan Third 500kV Line Project
Construction time: December 2023
Equipment model: SR135-S
Construction unit: Hunan Power Grid
PILE DRIVER PARAMETERS: PILE DIAMETER 1.6M, PILE DEPTH 11M
Address Overview: Soil layer
Construction efficiency: due to the collapse of about 8 meters underground, the hole formation time of a single hole is nearly 1.5 hours