2024.05.28
December 2023
Hengyang City, Hunan Province
electricity
Piling machinery
Project Name:Hunan Hengyang 500 thousand volt substation project
Project Location:Hengyang City, Hunan Province
Project Introduction:The project is located in the mountainous area, which is the project of the State Grid West-to-East Power Transmission from Ningxia to Hunan, where the transportation is inconvenient, the excavator needs to be used to repair the road, the equipment transfer is more frequent, the pile diameter is more varied, and the stratum is changeable.
Client:Zhongnan Survey, Design and Research Institute Co., Ltd
Construction Geology:Clay, weathered sandstone, limestone
Construction Equipment:SR135SCD00318
Bored pile diameter:φ1.4m、φ1.8m、φ2.0m、φ2.2m、φ2.4m、φ2.6m
Bored pile depth:8~18m
Construction drill pipe:Standard φ351×4×10 machine lock drill pipe
Construction Drill Bucket:Pick barrel drill and pick sand bucket with corresponding pile diameter
Construction Difficulties and Solutions:
(1) Equipment transfer, mountainous areas need excavators to repair roads, our 135S equipment can be transported with poles, the transportation height is 3.4 meters, it is not easy to be scratched by wires when transferring to the rural cement road, and rubber tires or wooden planks are laid at the time of rural cement road transportation;
(2) more than 2 meters of large-diameter pile holes, rock formations, construction difficulty, at this time can be similar to the plum blossom arrangement mode, that is, first use a φ1.2m drill bucket around the hole to core to the design depth, and then install a reaming wing above the φ1.2m drill bucket for reaming, to be expanded to the design depth, and then remove the pile bottom sediment.
Construction Efficiency:Depending on the diameter of the pile hole, the efficiency is different
Construction Fuel Consumption:The comprehensive fuel consumption of clay and rock formation is 14~19L/h