2024.10.25
In 2023
Shenzhen, Guangdong Province
earthwork
Piling machinery
Project Name:China Yiye Hengli Group Shenzhen Bay Super Headquarters Base Project
Project Location:Shenzhen, Guangdong Province
Device Model:SR485
Pile diameter:2500mm、2800mm
Pile Depth:55m~60m
Geology:0~10m seaside backfill layer, backfill is mainly stones, clay, gravel, construction waste, etc.;
10m~30m marine sedimentary silt, fine sand, coarse sand, gravel;
30m~40m fully weathered, fragmented strongly weathered granite;
40m~final hole Medium weathering, slightly weathered granite, rock saturation compressive strength 90~120MPa
Construction technology:Long casing under full rotation equipment, mud wall protection construction technology
Cone barrel drilling core, pick sand bucket slag fishing, drill pipe model, construction method, cone file construction



