2024.10.25
November 2022
Hangzhou City, Zhejiang Province
highway
Piling machinery
Project Name:Hangzhou-Shaoxing Expressway Hangzhou-Shaoxing section
Contractor:Suifeng Construction Company Limited
Pile foundation parameters:The pile length is 90m, and the pile diameter is 2800mm
Geology:0-30m clay layer, 30-75m silt layer, 75m-90 pebble layer.
Construction technology:Static mud wall protection
Construction Efficiency:2.8m rock-socketed double-bottom sand bucket, hole forming time is 20 hours, fuel consumption is 48L/h.