2024.11.29
January 2024
Wuxi City
Railway/tunnel construction
Piling machinery
Geology: plain fill, silty clay layer, local silty fine sand layer, strongly weathered argillaceous sandstone,Moderately weathered argillaceous sandstone.
Slotting parameters: trough width 1m, trough depth 44m.
Slotting accuracy: 1‰
Lowering speed: 57m/min
Impact speed: 65m/min
Construction efficiency: 12 hours / pair on average