2016.07.15
2010-03
Guangzhou
Railway/tunnel construction
Piling machinery
Sany SH400 is under construction at the construction site of the Liuhuahu Tunnel in Guangzhou, in which the groove is 800 meters wide and about 20 meters deep, under which there are full weathering, strong weathering, medium weathering rock formations, and with the cooperation of the percussion drilling rig *8981 is 10 meters deep into the rock.

Next article:Sany (SCC6300) participated in the construction of Zhejiang Zhoushan Peninsula Shipyard
share
Scan the code to share it on WeChat




Statement: The new advertising law stipulates that all page information shall not appear in the limit of words, welcome the majority of consumers to supervise, and find any violation of the advertising law, you can complain to the mailbox[email protected]。
